SHIFT / LATTICEPOINT SYSTEMS INC. — hauling ticket review checklist Operating aid; adapt to your contract. Job identity Job reference; customer or bill-to reference; receiving project and site. Check: Two jobs for the same customer can share a location. Use a stable job reference. Source identity Quarry, pit, or yard; source ticket number; ticket date. Check: Check source plus number plus date before treating records as duplicates. Hauling assignment Truck or trailer reference; driver reference; assignment or load reference. Check: A truck number alone does not identify every load on a multi-load day. Material Agreed product description; size or specification when relevant. Check: Keep similar materials and products from different sources distinguishable. Quantity Recorded quantity; unit; supporting scale record where used. Check: Preserve the original unit. Do not silently convert tons to cubic yards. Movement Pickup location; delivery location; available pickup and delivery times. Check: A source ticket and a delivery acknowledgement describe different handoffs. Supporting evidence Original ticket or attachment; delivery reference; notes on exceptions. Check: Keep evidence readable and linked to the correct load. Review and billing Reviewer; unresolved exceptions; approved billing basis and rate reference. Check: Separate factual load records from the commercial terms used to bill them.